Thursday, March 22, 2007
Appleton Lock #2
Aside from the completion of some site work, the restoration of Appleton Lock #2 has been completed. The stone chamber has been tuck pointed, the gates re-built using as much of the historic metal as possible and the valves and operating mechanisms have been fully refurbished and put back into good working order. The Appleton Locks will be in full operation within the next two months--once the ice fully melts and the canal is reflooded.